dc.description.abstractThis dissertation develops improvements to a new project scheduling procedure being developed at the Institute of Statistics, Texas A&M University. The project scheduling algorithm is a five step iterative procedure capable of determining a minimum cost project schedule when the activities making up the project have durations which are random variables. The cost of an activity is assumed to be a convex piecewise linear function of the activity's mean duration. The problem is to determine the activity mean durations which both minimize the total project cost and insure that the mean (or some specified percentile) of the corresponding project completion time distribution is less than or equal to a specified project deadline. The entire distribution of the project's completion time under the minimum cost schedule is a valuable by-product. A critical step, Subnetwork Analysis, in the proposed procedure is improved and extended. Subnetwork Analysis determines an estimate of the duration distribution, F(t), for each subnetwork identified in the previous steps. This estimate is extended to include an extrapolation of upper and lower bounds on F(t). This dissertation also develops a new sampling procedure which results in improved estimators for the bounds on F(t). A computer system implementing the project scheduling procedure (including the improvements in Subnetwork Analysis) has also been prepared.en
dc.format.extentx, 83 leavesen
dc.format.mediumelectronicen
dc.format.mimetypeapplication/pdf
dc.language.isoeng
dc.rightsThis thesis was part of a retrospective digitization project authorized by the Texas A&M University Libraries. Copyright remains vested with the author(s). It is the user's responsibility to secure permission from the copyright holder(s) for re-use of the work beyond the provision of Fair Use.en
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/
dc.subjectProduction schedulingen
dc.subjectMajor statisticsen
dc.subject.classification1978 Dissertation B168
dc.subject.lcshProduction schedulingen
dc.titleImplementing a new statistical approach to project schedulingen
dc.typeThesisen
thesis.degree.grantorTexas A&M Universityen
thesis.degree.nameDoctor of Philosophyen
dc.type.genredissertationsen
dc.type.materialtexten
dc.format.digitalOriginreformatted digitalen
dc.publisher.digitalTexas A&M University. Libraries
dc.identifier.oclc4793713


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record

This item and its contents are restricted. If this is your thesis or dissertation, you can make it open-access. This will allow all visitors to view the contents of the thesis.

Request Open Access